Tuesday, September 6, 2011

Day 2 - Lotsa rain

Continued working on the floor today. Failed to take a picture yesterday (gotta get used to stopping and taking pictures), so here's one midway through decking.


It's been raining here almost non-stop for the past four weeks and today was no exception. At one point I had to stop for about 15 minutes as it was just to wet to work. The plan today was leveling the framing, squaring and decking. Amazingly enough it was almost completely level to begin with so I shimmed the low spots. The framing is 2x4s, topped with 6 mil vinyl sheet (to make the bottom air tight) and 3/4" plywood. With the rain delay I wasn't able to quite finish, but here's where I'm at as of tonight.


2.5 hours